Buyer Information
Do you have a residential site to develop?
We sell quality houses
We maintain a stock of quality houses for removal and relocation. We are happy to provide advice for those exploring the option of purchasing a relocatable home.
Follow our expert guidance
The three stages of house relocation
House relocation provides a truly rewarding, cost-effective option for first and subsequent home ownership, developers and landlords.
01.
Purchasing a site
02.
Finding a house
03.
Making it happen
01.
Purchasing a site
If you’ve decided to pursue the idea of house relocation, you’ll want to identify a site on which to locate your new home. You’ll need to ensure the site is suitable and:
- No covenants exist on the property that excludes the re-siting of a relocatable home
- Access to your property is wide enough, and unobstructed at the entrance to the site and along the access roads, to enable a house to be transported to the site
- The provision of power to the site and drainage and sewerage discharge from the site is achievable and affordable
- Your site is not located in an extremely high wind zone, or a potential flood zone, or on an area of unstable ground (if so, you can possibly still re-site a house on the land, but you’ll need additional engineering)
02.
Finding the perfect house
There are some aspects to consider when you are evaluating houses for removal.
One of the first considerations is to ensure the house is structurally sound. Uplifting Homes stock only quality houses for removal and most are built from strong, native timbers.
You’ll want a house with a layout that can be orientated on your site to take full advantage of the sun. It’s important to know where the sun will rise in the morning and set in the evening in relation to the main living rooms of the house.
As you’re buying an existing home, you’ll possibly want to make alterations to the layout. You may wish to open up an exterior wall with an additional exterior door onto a deck. Or maybe even replace a bathroom.
03.
Making your house relocation project happen
We will work with you, providing you with approximate costings for your budget. And we work very closely with you to achieve all the requirements of your building consent, compiling and submitting your consent application to Council.
What you’ll need:
A geotechnical report
This report shows your soil stability, which is vital in the house relocation process. Unstable soil could cost you up to $50,000 in additional foundations.
Think of it as part of your due diligence when buying a property suitable for house relocation. If the geotechnical report identifies any concerns you’ll possibly need an engineer to design your foundations and it may take a few weeks to complete.
Septic and storm water reports
This clarifies what septic systems you will require. The company that does your geotechnical report can also do these. If you have a mains connection, you will not require this report.
A building report
House relocation generally involves a second-hand building report. This report attests that the house is in a sound and suitable condition to be moved. All second-hand dwellings require a second-hand building report, which is required before we can apply for a building consent. Within the Waikato District, the Council will do this for you. Contact them directly to make a booking.
A site inspection
We really look out for the interests of our house relocation clients and will need to come and see your site. We’ll check the access, any concerns around access in the local vicinity or en-route with trees, bridges or other obstructions blocking the route, and any concerns on the site.
It might mean that we need to cut the house, crane or winch it to manoeuvre around obstacles. If there are any additional costs relating to this work, we’ll cover these off with you during the site inspection too. It’s the perfect time to discuss any concerns you might have too.
Indicate any change you wish to make to the house
We’re happy to consider any alterations you wish to make to the house when we draw up the plans for the building consent. This is the time to consider whether you’ll want to change any details on the floor plan, add decks or verandas or maybe put a shed on the site.
While you can erect sheds and decks at a later date, you’ll need to apply for, and pay for, another building consent. So you’d be wise to do it all at the same time.
Decide where on the site you want the house to go
This can be drawn on your Certificate of Title. It shows exactly where you want to place the house on your property. You’ll need to show its orientation, exactly how many metres from the boundary and any obstructions that may hinder the possible positioning of the house. Typical obstructions are things like power poles, creeks, ponds, driveways.
Consider your finance
Some house relocation clients require second-tier lending or bridging finance. It depends on your situation but it can sometimes be challenging to obtain finance for a relocatable home. You may wish to consider working with a finance broker as they tend to be more creative in their application.
A resource consent
A resource consent is usually required to bring a second-hand building into an area. And your site may require additional resource consents if you are subdividing or putting a secondary building onto a site. Additional costs will be incurred for preparing these.
Moving the house to your site
When it comes to house relocation this is the exciting part. Depending on the size and shape of your relocatable house, it may need to be transported in more than one piece. Once at the new property, it can be re-joined and then lowered onto its new foundations. The process of moving a house is always conducted at night.
A direct relocation from Point A to Point B is obviously the more cost-effective option when moving a house and is, in most situations, achievable, so long as the resource consent application has been completed.
Once your relocatable house has been lowered onto its foundations you’ll be able to embark on making any alterations.
If it is not possible to move the house directly to your new site we can arrange storage. This is often required if your site work is held up by any additional Council requirements.
Once the house arrives on site, you’ll need to follow strict safety procedures. You’ll need to arrange safety fencing and abide by all health and safety laws pertaining to a building site.
Insurance
Your building consent should be through in 20 working days. If your house has been moved already, it can now be lowered onto its foundations.
Waiting for your building consent
Your building consent should be through in 20 working days. If your house has been moved already, it can now be lowered onto its foundations.